Thursday, July 29, 2010

1st & 2nd week summary.

1st week

*When talk about management, we must consider this 4 comman activities (1)Planning(2)Lead(3)Organize(4)Control. with this 4 comman activities we will came out with a good management activity.

*Def.Proj.Management
The application of knowledge,tools,techniques to project activities.






















1-Time 2- Cost 3- Quality 4-Scope 5-Communication 6- Human Resources 7- Procument

8- Risk 9- Integration



Stakeholder = Person who has an interest in the project

eg: 1- Project Owner 2- Project Manager



* Triple Constraint(3C)







The best management in any project is, the quality of project must be in ideal condition. The time,scope, and cost of any project must be balance, if not we will compromise with the quality of project( either in good quality or not )













2nd weak



*Tools and Technique.
learn the right technique to thinking. when think not only data we anlyze but all the posible we can(kaji yang tersurat dan tersirat).

*Project Life Cycle (PLC)
PLC must have start and end.
eg: When the project is started, and when the project will end.

there 4 phase in PLC:-
1- Initiating( Project Mula)
- Project feasibility,project initiating/kick off document
2-Planning
- Gantt Chart (GC), Work Breakdown Structure (WBS),schedules and Task List. GC & WBS very imporant in planning
3-Excuting/Controlling
- Task List,Issues List, buy list, deliverable.
4-Clossing
- Close Out document, Customer Satisfaction Assesment.


*Output Vs Deliverable
Deliverable is subset to output.

eg: buat kek
Output= sebiji kek.
Deliverable= untuk buat kek, kita kene beli tepung, pukul telur, bakar kek dan sebagainya. jadi setiap aktiviti2 ini perlu di siapkan untuk menyiapkan dan hasilkan kek. Maka, aktiviti yang siap ini boleh dipanggil sebagai deliverable. contohnya,selesai membeli tepung, selesai memukul telur dan selesai membakar kek.

:-)

Thursday, July 22, 2010

Road Network Upgrade/PM03

Proposed Design,Construct,Rehibilitate, and Upgrade of Jalan Alor Setar-Kuala Nerang-Durian Burung,Kedah.

Client:Jabatan Kerja Raya Malaysia (JKR)

Contractor: HCM Engineering Sdn Bhd

Start Job: 16 Sept 2006

End Job : 17 March 2011

Cost : RM246.2milion



Triple Constraint:

Projek membina dan menaik taraf laluan ini memakan masa yang agak lama lebih kurang 4tahun setengah malah projek ini juga menelan kos yang agak besar. Dengan kenaikan harga petrol baru-baru ini, projek ini juga tidak boleh lari dari merasakan tempias bebanan dari kenaikan harga ini. Memandangkan kos ini di rangka pada awalnya di zaman ekonomi stabil, jadi ia tidak mengambil kira harga bahan binaan pada masa ini. Kos pengangkutan bahan binaan akan meningkat ekoran dari kenaikan harga bahan bakar baru-baru ini, sekali gus meningkatkan kos bahan binaan. Mahu atau tidak, pihak kontraktor mungkin terpaksa brkompromi dari aspek kualiti tetapi tidak pada skop kerja.


Monday, July 19, 2010

HARI DAN WAKTU BARU UNTUK KELAS PENGURUSAN PROJEK

Salam,
kehadapan semua sahabat yang dikasihi, seperti yang kita sedia maklum kelas pengurusan dan organisasi (MGT) telah ditukar ke hari rabu 6.10pm-9.10pm. maka dengan ini ia secara rasmi telah bertindih dengan kelas Pengurusan Projek.

Jadi sila beri cadangan hari dan waktu untuk kelas Pengurusan Projek.

Thursday, July 15, 2010

EMPANGAN BAKUN, SARAWAK/PM02

Bakun Dam


Client:Malaysia Goverment

Project Own: Sarawak Hidro Sdn Bhd the susidiaries company of Ministry of Finance.

Contractor:Malaysian-China Hydro Joint Venture (MCH JV).

Project Manager:Gilles Porlier.

Start Job:-

First attempt:Year 1960 start with land survey job,followed by studies of Rock and Soil, hydro potential and so on. But in years1990 project had been hold.

Second Attempt: Year 1993 work operation is continue but in 1997 the project has been stoped because of Global Economy Crisis.

Third Attempt: Sarawak Hidro Sdn Bhd continue project work in 1 May 2000 untill now.

End Job: Belived that finish before 2012, end of year 2011.

When this project finish,it will be provide 2400MegaWatt to Peninsular Malaysia,Sabah,Sarawak,Brunei and Kalimantan. But in end of year 2010, Bakun dam can produce 300MegaWatt.

Cost:RM3.o88045bilion (contract value based on Sarawak Hidro Sdn Bhd from may 2000 ).

Triple Constraint.

KOS

Projek ini mengambil masa yang agak lama untuk di siapkan, bermula tahun 1960 dengan kerja-kerja ukur tanah,kajian batuan,reka bentuk empangan,kajian janaan hidro dan sebagainya.

Projek ini juga telah beberapa kali tertunda dan akhir sekali telah diambil alih oleh Sarawak Hidro Sdn Bhd (SHSB). Kos sebanyak 3 bilion itu hanyalah kos bagi kerja-kerja bermula dari mei 2000 setelah SHSB mengambil alih projek ini.

Kos sebenar mungkin lebih tinggi dari 3 bilion jika kerja-kerja awal diambil kira. dan kos ini sudah tentu dapat dikurangkan sekiranya projek ini tidak terbengkalai beberapa kali. Sekiranya projek ini dapat disiapkan lebih awal,kos bahan mentah pengangkutan dan upah pekerja dapat di kurangkan.

KUALITI

Kualiti Projek mungkin terjejas sekiranya projek ini tidak dapat disiapkan dalam tempoh masa yang ditetapkan. Ini kerana semakin lama projek ditangguh contraktor akan dibebani dengan kos bahan mentah yang semakin meningkat, jadi untuk mengurangkan beban ini pihak kontraktor berkemungkinan menggunakan bahan yang kurang kualiti yang lebih murah.

SKOP

Skop kerja mungkin tidak banyak berubah kerana ini merupakan projek penting dan pihak berkenaan telah menetapkan sasaran awal iatu jumlah tenaga yang dapat dijana sebanyak 2400MegaWatt. Jadi sekiranya skop kerja diganggu maka sasaran tenaga yang dijana mungkin tidak tercapai.

Sekian

Reference:

1-Wikipedia

2-Sarawak Hidro.com

3-Utusan Malaysia online-arkib 05/11/09







Kelengkapan

Whiteboard marker dan bateri 3A untuk kelas pengurusan projek baru sahaja saya beli.

Wednesday, July 14, 2010

Jambatan Kedua Pulau Pinang/PM01

Penang Second Bridge

Client: Jambatan Kedua Sdn Bhd representative of Malaysian Goverment.
Project Own By: UEM construction Sdn Bhd (UEM).
Contractor: China Harbour Engineering Co ltd (CHEC).
Project Director: K.Preamakanthan (UEM).
Project Manager: Chang Yunbo (CHEC).
Commencement Date: June 2009.
Finish Date: First dateline end of 2011, but extended to September 2013.
Cost:RM4.5bilion.

Triple Constraint:

Tempoh masa untuk menyiapkan projek jambatan ini telah ditunda dari tarikh asal penghujung tahun 2011 kepada september 2013. Maka dengan penambahan waktu ini berkemungkinan akan melonjakkan sedikit sebanyak kos pembinaan dari kos yang sebenar. ini kerana mengambil kira harga pasaran bahan binaan yang semakin meningkat dari semasa ke semasa serta kos untuk membayar gaji pekerja turut bertambah. Skop untuk projek ini tidak berubah tetapi kualiti projek mungkin sedikit sebanyak terjejas seandainya kos pembinaan sama seperti kos asal, ini kerana ketika budjet untuk pembinaan ini dibentangkan pada RMK-9 ia tidak mengambil kira harga pasaran bahan mentah yang semakin meningkat dan kos operasi yang turut meningkat ekoran pertambahan tempoh bekerja.

reference:

1)www.uembuilders.com
2)www.jasa.gov.my
3)http://www.kkr.gov.my/ms/node/3669
ape beza pengarah pengurusan projek dgn pengurus projek?????
peninnnnn